The AI build-out, 2026–2035
Demand is the world's work, counted in the tokens an AI would need to do it. Supply is what the fleet of AI chips can serve, built year by year and worn out over time. Pick a world, move the inputs, and watch who keeps the margin.
Load a world
What the filings say
the model's 2026 is set against these · rebuilt 2026-10-15- Top-5 hyperscaler capex, a quarter $182B 2026Q2 · a year before: $97B · $726B a year at this pace
- …as a share of their operating cash 97% 2026Q2 · last four quarters: 82%
- Top-5 hyperscaler debt $487B 2026Q2 · a year before: $245B
- Nvidia revenue, a quarter $96B 2026Q2 · a year before: $47B
- Micron revenue, a quarter $54B 2026Q3 · a year before: $11B
- SK Hynix revenue, a quarter ₩79.3tn 2026Q2 · a year before: ₩22.2tn
- TSMC revenue, a quarter NT$1270B 2026Q2 · a year before: NT$934B
- Contracted backlog: MSFT, ORCL, GOOGL, CRWV $1.95T 2026Q2 · a year before: $651B · all customers, not only AI
- OpenAI + Anthropic revenue, annualised $105B 2026-08 · Epoch AI estimate
- 10-year Treasury yield 5.19% 2026-10-14
- H100 rent, per GPU-hour $2.65 2026-10-11 · Ornn index
Tokens a year
Log scale, quadrillions (Q) of tokens. Usable capacity is 65% of running every chip flat out. On a log scale a gap that looks small can be large: the label at the right gives it.
Who gets paid
A year, in dollars. Chip and system makers' revenue from the build; the labs' margin, what buyers pay them less the fleet's rent; and the fleet owners' return over their cost of capital, below the zero line when they fall short. The essay walks through it.
Demand as a share of capacity
2026 is set at 77%: tight, as GPU rents show. Below 50% is a glut; above 100%, price rations demand.
The fleet: built, worn out, running
GW of AI capacity installed each year (up) and retired (down), with the fleet running at year end.
Capex: the filings, then the model
Solid: the top five hyperscalers' capex from their filings, the running year annualised. Line: the model's spending by every builder. The top five are most of it, not all.
AI in the world economy
Log scale, each as a share of world GDP: about $125T in 2026, growing 4.5% a year, plus the capex and the change in consumption the model adds. Wages AI replaced is the work AI does, valued at what people were paid for it; the other line is what buyers pay the labs for it.
Revenue against what the build needs
Log scale. What buyers pay the labs for AI; what the fleet earns in compute rent, paid by the labs from that revenue and from investors; and what the fleet needs to earn its cost of capital plus power and running costs. The gap between the first two is the labs' margin. Rings: the two biggest labs' revenue run rate, part of what buyers pay.
Growth each year
Where the magenta line runs above the blue, demand is gaining on capacity.
What a year of AI work costs
Break-even price for one worker-year of AI output, against the average knowledge worker's cost.
AI's share of world electricity
The fleet's draw (IT load × 1.2 for cooling, at 60% average load) against world generation. Dashed: the ceiling you set.
The economics at a glance
How the model works
- Demand = total intelligence demand × AI's share. Total demand starts at 4.6 sextillion tokens a year: about 1 billion knowledge workers, weighted by the tokens an AI needs per job (about 0.5 billion a year for routine service work, about 25 billion for expert work). It grows with the work demanded and the tokens per unit of work.
- AI's share starts at 3.3%, set so 2026 demand matches the roughly 150 quadrillion tokens served worldwide as a full-year average. That total is scaled up from Google's 3.2 quadrillion a month, assuming Google serves 25–30% of all tokens.
- Supply is built by chip generation. The 2026 fleet of about 40 GW mixes chips installed in 2023–26, half of it this year. Each year's new chips are more efficient than the last; software gains apply to every chip. Chips wear out over a spread of years, so capex does not echo the build of six years before.
- The money runs buyers, labs, fleet. Buyers pay labs for AI work: frontier work off what it is worth, commodity work at about its compute rent. Labs pay the fleet's rent from that revenue and from investors. The rent follows the fleet's cost and how busy it is, and is capped by what the labs can pay. What buyers pay beyond the rent is the labs' margin.
- Suppliers and lenders answer the market. Packaging, memory, wafer and grid makers add capacity when their order books overflow, after a lead time. Lenders lend more against a sold-out fleet and less against an idle one, and builders spend what AI earns.
- Usable capacity is 65% of the theoretical maximum. On that basis 2026 runs at 77%, which matches rising GPU rents and sold-out older chips.
- Builders move halfway each year from last year's build to the one they want, since sites, power and chip orders take about two years. Near the power ceiling the grid fills gradually: each year builders get at most half the room left.
- The happy ending needs demand to outrun the fleet. The owners earn their cost of capital only in a shortage, and software gains of more than about 60% a year end it by moving the margin to the labs.
- Every input is an estimate. The model's 2026 is set against the filed figures above; later years are scenarios, not forecasts.
What version 1 says: Who the AI build pays. Built for The Token Ceiling and The same chip, three businesses.