Analysis
Who the AI build pays
Our model of the AI build-out, rebuilt in a day after two reviews took it apart. Scored the same way, the chip makers clear their cost of capital in every world we tried. The data-centre owners' new build pays where something holds the build back. The labs fall short in every world we named, and in most of them one runs out of money.
What changed
The first version of this piece scored the AI labs on what buyers paid them less their compute rent, so they kept a margin in 99% of worlds by construction. Two reviews and a reader since found the same kind of fault elsewhere, and all are fixed. The labs are now three, each paying its own bills, and every layer is scored one way: what it earned from 2026 to 2035 against its costs and its cost of capital. The forecast page runs the result.
Simulation · runs in your browserRun the AI build‑out yourselfPick a world, move any dial, and watch who gets paid each year to 2035.27 named worlds58 dials10 yearsOpen the forecast ↵Who gets paid
In the soft-landing world buyers pay $10.1T for AI over the decade. The chip and system makers sell $7.8T of hardware into the build and clear their cost of capital by $2.2T, after production costs, running costs and the plants they build. The data-centre owners fall $1.7T short: $1.0T on the fleet they already owned, $0.7T on the build from 2026. The labs fall $2.4T short, and investors make up the difference until 2032, when the challenger — a fifth of the labs’ revenue, half of their compute contracts — runs out of money.
The new build pays when something holds it back
Set what buyers paid against what the build cost in the same years — the fleet’s capital, power and upkeep, and the labs’ running costs. In soft landing buyers pay 78 cents on the dollar. The owners’ build from 2026 earns its cost of capital in 14 of 27 named worlds, mostly where something holds the build back: a power wall (+$3.0T), a supply chain that cannot keep up (+$1.2T), hyperscalers holding back, or a credit scare that stops the neoclouds. Where builders chase demand, or demand disappoints, it loses up to $6T.
Who keeps the efficiency gains
Most compute is rented on contracts. Anthropic’s $518B of commitments are about 80% non-cancellable. A contract protects the owner in a glut and caps it in a shortage. What it does with software gains depends on its terms. Rent a GPU by the hour and the tenant keeps whatever better software gets out of it. Sell a model by the token and the owner does.
In soft landing, moving from no contracts priced per token to all of them takes the owners from $1.3T short to $0.6T ahead. At either extreme the labs fall about $3.5T short, against $2.4T at the model’s default; what changes most is when one runs out of money — 2035 with none per token, 2028 once a third are. Every lab deal we could find is priced per megawatt or per GPU, so the model assumes 15% per token. The contracts that would settle it are not public.
The labs’ console war
Each lab must train the next model or lose the frontier: everyone launches, and investors pay for the launches. Prices do not rise to cover it. Anthropic’s share of business spending on OpenRouter fell from over 75% to half between January and September, and open models carried 56% of Vercel’s tokens in August. Anthropic told investors its gross margins top 80% before revenue sharing and training costs, the FT’s sources said; the model lets frontier work sell at up to three times its compute cost, a 67% gross margin.
The model now carries three labs. The challenger has a fifth of what buyers pay but half of the compute contracts and half of investors’ money, and it runs out of money first in 20 of 27 named worlds; the others go first when investors pull back or prices collapse. Exactly when is sensitive to how contracts and funding are split, so the model’s claim is that one fails, not the year.
The record is paying attention. TEXXR holds 8 articles matching “open-weight” from July to September 2025, and 57 in the same months of 2026.
Memory is the exception among the chip makers
Memory makers price on HBM’s order book, and they swing hardest: DRAM contract prices rose nearly 400% in eight months, and Micron’s gross margin reached 85%. In soft landing they make money through 2030, then build too much: by 2033 HBM sells below what it costs to make, and they lose money every year from 2031. Halve the HBM supply the forecast expects and they clear their cost of capital by $0.6T; double it and they fall $0.4T short. Across the sampled worlds they clear it in nearly nine of ten, a few of them by a great deal.
Situational Awareness, run through the model
Leopold Aschenbrenner’s 2024 essay Situational Awareness forecast ~$500B of AI investment around 2026, over $1T in 2027 and ~$8T by 2030. Spending ran ahead of that path; revenue ran behind it. The essay expected a $100B AI run rate at a company like Microsoft by about 2026; Microsoft’s AI business passed $37B. Run the essay’s assumptions through the model — AI doing half its eventual work by 2028, drop-in workers priced at up to 60% of a wage, supply doubled, a race to build — and spending reaches $4.1T in 2030. The chip makers clear their cost of capital by $10T and the labs fall $10T short; the challenger runs out of money in 2030. Cap power at 5% of world electricity and the owners’ new build earns $10.8T: the bet the fund’s filings describe, long power and the sites wired to it.
What 3,000 sets of assumptions say
Drawing 24 inputs over stated ranges, with capability-driven ones moving together, the chip makers clear their cost of capital in all 3,000 draws, the owners in 14%, the labs in 4%. That measures how the answer depends on the assumptions, not the odds of any outcome. The input that moves the owners most is how fast the cost of a gigawatt rises: the chip makers’ pricing. Some of Nvidia’s top customers have been told system prices rise 15% or more from early 2027, Bloomberg’s sources said.
The spread matters as much as the share. The chip makers’ worst draw still clears their cost of capital by $0.8T; their median is $2.0T above it. The owners’ median is $3.0T below, the labs’ $2.0T below, and both have a thin tail of big wins. In nine draws of ten a lab runs out of money before 2036.
What to watch in the next year
- Anthropic’s listing, expected in November: the first lab to report audited accounts every quarter, contract terms included.
- Lab revenue against commitments. OpenAI told investors its run rate was near $50B, not $70B, against about $750B of projected cloud spending through 2030.
- Neocloud yields. CoreWeave’s bonds near 15% show lenders pricing risk before any default.
The limits
The model’s 2026 is fitted to observed figures, so matching it is no evidence. Its 2027 forecasts for top-five capex, Nvidia’s and Micron’s revenue and the two big labs’ run rate are written down now and will be scored as filings arrive; for Nvidia the model expects about +18% in calendar 2027, against the company’s forecast of about +70% for its fiscal 2028. Tokens stand in for useful work, and contract terms, the owners’ own products and training’s share of the fleet are estimates. The model says nothing about any share price. Every input is on the page to change.
Try it · scarcityFind out what keeps the owners paidLoad the power wall, where compute stays short and the new build pays. Then add power and watch the owners lose it.+$3.0T the new build14 of 27 worlds that pay itLoad the power wall ↵Sources
Filed figures: SEC EDGAR 10-Q and 10-K filings (capex, operating cash flow, debt and remaining performance obligations for Microsoft, Oracle, Alphabet, Amazon, Meta and CoreWeave; Micron and Nvidia revenue and margins). Lab revenue: Epoch AI and company statements. GPU rents: SemiAnalysis one-year H100 contracts; Ornn H100 index. The model: the forecast page, which runs in your browser. Every model figure here comes from that code, run on 2026-10-15; the named worlds are its presets.